4. Peel off protective backing from track
seal. Apply seal to room side of window
Apply track seal to window
side of track.
track. Center of seal strip should coincide
with the line marked in Step 2. The two
screw holes drilled in Step 3 should be
directly above seal strip in the inner track.
5. Securely attach a siding-protection board
to side of house.
NOTE: Siding-protection board should be
long enough to span 2 wall studs.
Inside wall of
house
Siding-protection
board
Outside edge is 3/16-inch
6. Place platform assembly, with platform
lower than inside.
tab against inside of window track, and
attach it to window jamb. Use appropriate
length screws (Items
Put platform
9-11 in Preparing For Installation).
tab against
inside of track.
7. Adjust platform assembly so that outside
edge is 3/16-inch lower than inside edge, as
shown right. This ensures proper water
drainage from the air conditioner.
8. Level platform assembly from side-to-
side.
Also, make sure window track is level. Use
leveling shims as necessary to ensure unit is
Measure dis-
level from side-to-side.
tance and
subtract
20 5/8 inches.
9. Measure height of window opening from
top of platform assembly as shown right.
Subtract 20-5/8 inches. Mark this measure-
ment on plastic window panel, along the
longer side.
(continued)
6