Dynalite DDNG-KNX Panduan Instalasi

Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Gerbang Dynalite DDNG-KNX. Dynalite DDNG-KNX 2 halaman. Network gateway

DDNG-KNX
Network Gateway
Installation Manual
features
Powered From The DyNet Network - Mains supply not required
Optically Isolated between the two communication Ports – 2.5KV
surge isolation.
Allows KNX integration to Philips Dynalite lighting control
system
Powerful Internal PLC - Custom scripts can be written to provide
process control based on conditional logic. Feature allows the
gateway to before logical calculation from messages received and
then peform the required reaction.
DIN Rail Mounting - 6 Units wide.
Warning – This is a class A product. In a domestic environment this product
may cause radio interference in which case the user may be required to take
adequate measures.
Read Instructions – We recommend that you read this Instruction Manual prior
to commencement of installation.
Special Programming – This device will only operate in basic modes unless
programmed via a computer. If programming is required, contact your local
agent for details. Once the data cable is connected to the devices, the factory
default settings will allow any control panel to operate all channels in all
controllers.
Mounting Location – Install in a dry, well-ventilated location.
Data Cable – Use screened, stranded RS485 data cable with three twisted
pairs. Segregate from mains cables by 300mm. Connect devices in a 'daisy
chain'Do not cut or terminate live data cables.
Correct cabling – Insure that correct polarity of the KNX and DyNet ports are
maintained and that only approved cables are used for each port.
installation steps
1.
Mount the device on a DIN rail inside an appropriate enclosure.
2.
Ensure the both Dynet and KNX networks are powered down before beginning termination
3.
Connect data cables to the device as per diagrams. Note that the device is powered from the DyNet network segment that is connected to Port 1.
4.
Connect KNX network to second port of gateway. Ensure that correct polarity is maintained.
5.
Power up both Dynet and KNX networks.
6.
The gateway is now ready to be commissioned.
electrical diagram