Celexon Professional Plus Panduan Petunjuk Pengoperasian - Halaman 5
Jelajahi secara online atau unduh pdf Panduan Petunjuk Pengoperasian untuk Aksesori Proyektor Celexon Professional Plus. Celexon Professional Plus 8 halaman. Screen
Juga untuk Celexon Professional Plus: Panduan Instalasi (13 halaman), Panduan Pengguna (8 halaman), Panduan Petunjuk Pengoperasian (6 halaman), Panduan Petunjuk Pengoperasian (11 halaman)
IN THE BOX
1 x Screen
4 x Plastic dowels
4x Screws
INSTALLATION NOTES
Install the screen in a position that is fully visible to all viewers! The optimum
installation height corresponds to the position of the viewers in the centre of
the screen with the screen fabric extended: eye level = lower third of the screen
surface.
The screen can be installed on the wall/ceiling or hung from the ceiling on
closed ring eyelets plus screwable karabiners (the eyelets are already on the
side cap). For wall or ceiling installation only, the eyelets should be removed
in advance). Please make sure that the metal shims are also used for wall and
ceiling mounting, otherwise safe installation cannot be guaranteed).
The enclosed installation material is intended for a solid stone wall. If neces-
sary, obtain suitable mounting material for your installation surface.
MOUNTING ON THE CEILING (VIA EYELETS)
Measure the distance between the
eyelets.
Mark
the
points
on
the
ceiling and make sure that the eyelets
are aligned with each other and parallel
to the wall.
4