Celexon Expert Pure White Panduan Instalasi - Halaman 2

Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Penyaji Digital Celexon Expert Pure White. Celexon Expert Pure White 3 halaman. Fixed frame screen
Juga untuk Celexon Expert Pure White: Panduan Pengguna (10 halaman), Panduan Petunjuk Pengoperasian (11 halaman)

Celexon Expert Pure White Panduan Instalasi
Parts list
Before installing, please check that all parts listed are included. If anything is
missing, please contact your dealer/reseller.
4 x aluminium frame segment (A)
3 x adjustable mounting brackets (B)
rubber tensioning straps (C)
4 x galvanized rods (D)
3 x screws+wall plugs (max
300x225) (E)
4 x screws+wall plugs (min 350,
max 400 cm) (F)
1 x projection fabric (G)
4 x PVC corner covers (H)
1
Caution
Before installing the screen, please read the instructions carefully. We would
recommend that these instructions are stored safely for future reference. The
manufacturer does not take responsibility for any damage to property or personal
injury resulting from improper use or installation.
Do NOT install the screen nearby or over radiators or air conditioning units as the
PVC coating is a plastic material which stretches and remains damaged when
subjected to heat and/or cool air.
Do NOT install the screen facing direct sunlight or blocking a window as the PVC
coating might get damaged as per the reasons above.
The PVC coated fabric is very sensitive to temperature variation. We recommend to
wait 2 hours for the screen to acclimatise before assembling the screen, esp when
the screen has been very cold and is brought into warmer temperatures.
Do NOT treat the fabric with alcohol or acidic cleaning products. Dust with a feather
duster or microfibre cloth.
Stains on the fabric cannot be erased.
We recommend that you check every 6 months that the screws, wall plugs and
brackets are in good condition and well tightened.
Do not stand under the projection screen.
Do not use the projection screen outdoors.
2