2gig Technologies 2GIG BRDG1 900 Petunjuk Instalasi

Jelajahi secara online atau unduh pdf Petunjuk Instalasi untuk Router Jaringan 2gig Technologies 2GIG BRDG1 900. 2gig Technologies 2GIG BRDG1 900 4 halaman. Bridge ip communicator

2GIG-BRDG1-900
Go!Bridge IP Communicator

INSTALLATION INSTRUCTIONS

The Go!Bridge™ IP Communicator (2GIG‐BRDG1‐900) provides 
Internet connectivity between the monitoring service's Central Station 
and the Go!Control® Panel (requires the 900 MHz Transceiver (2GIG‐
XCVR)). 
It supports automatic firmware updates, provides interactive security 
services, and increases supervision using signal‐forwarding to the 
Central Station. For wireless communication with the Control Panel, 
the 900MHz Transceiver Module (2GIG‐XCVR) must be installed in the 
panel. For Internet access, the Go!Bridge must be connected to the 
local network router using an Ethernet cable (not provided).

Box Contents

Verify that the package includes the following:
• 1—Go!Bridge 
• 1—5VDC USB Mini‐B Power Supply
• 1—Stand
• 1—Power Supply
• 1—Plastic Power Supply Bracket with Adhesive Backing 
and Zip Tie
• 2—Wall Socket Screws for Power Supply Bracket
Requirements
Before you install, program, and test the Go!Bridge, ensure the control 
panel being paired with the Go!Bridge meets these requirements:
• Firmware Version 1.12 (or higher)
• 2GIG‐XCVR 900 MHz Transceiver
IMPORTANT:
For compliance with UL 1023: Household Burglar‐
Alarm System Units, the Go!Bridge must be installed in the 
same room as the Internet modem or router.
NOTE:
To protect data sent via the local wireless network, it is 
recommended that you install the Go!Bridge on a local 
network where either WPA (Wi‐Fi Protected Access) or WPA2 
(Wi‐Fi Protected Access II) encryption is already enabled.
After installing, programming, and testing the Go!Bridge, you will need 
to register a new customer with the third‐party monitoring service. 
See Registration on page 3.
Figure 1 Go!Bridge Front View—LED Indicators and Learn Button
A Network LED
B 900 MHz LED
C Learn Button
Powering ON the Go!Bridge
Use these steps to power ON the Go!Bridge:
1
Attach the power supply to the bracket (provided) as follows:
Insert the power supply into the enclosure on the plastic 
1a
bracket. See C in the figure below.
Secure the power supply to the retaining bracket by threading 
1b
a zip tie through the bracket's slots. See D in the figure below. 
Affix the bracket to the wall outlet with the adhesive backing. 
1c
Then secure it to the outlet with the two (2) screws (provided). 
NOTE: Always use the provided power supply bracket in the United 
States (and other countries where it is required). Canada does not 
require the power supply retaining bracket.
Figure 2 Power Supply and Bracket
A 110V Wall Outlet
B
AC Power Supply Bracket
AC Power Supply
C
D Zip Tie
Connect the Go!Bridge to the power source. 
2
Do not connect an Ethernet cable to the Go!Bridge at this 
NOTE:
time. You will connect the cable when completing the steps in 
Programming the Go!Bridge into the Control Panel.
3
(Optional) Place the stand (provided) on a counter, desktop, or 
other flat surface. Set the Go!Bridge in the stand.
Verify that the two (2) LEDs on the Go!Bridge illuminate in RED. 
4
See Figure 1  Go!Bridge Front View—LED Indicators and Learn 
Button. 
1
Copyright © 2014 Linear LLC