Aire-Flo 47 Panduan Petunjuk Instalasi - Halaman 13

Jelajahi secara online atau unduh pdf Panduan Petunjuk Instalasi untuk Pendingin Udara Aire-Flo 47. Aire-Flo 47 18 halaman. 14 seer

Aire-Flo 47 Panduan Petunjuk Instalasi

STEP 5 -- UNIT START-UP

IMPORTANT
If unit is equipped with a crankcase heater, it should be
energized 24 hours before unit start-up to prevent
compressor damage as a result of slugging.
1 - Rotate fan to check for binding.
2 - Inspect all factory- and field-installed wiring for loose
connections.
FIGURE 13. Typical Unit Wiring Diagram
Page 13
3 - After evacuation is complete, open the liquid line and
suction line service valve stems to release the
refrigerant charge (contained in outdoor unit) into the
system.
4 - Replace the stem caps and tighten to the value listed
in table 2.
5 - Check voltage supply at the disconnect switch. The
voltage must be within the range listed on the unit's
nameplate. If not, do not start the equipment until you
have consulted with the power company and the
voltage condition has been corrected.