HighPoint R1120 Panduan Instalasi Cepat - Halaman 4

Jelajahi secara online atau unduh pdf Panduan Instalasi Cepat untuk Perangkat Keras Komputer HighPoint R1120. HighPoint R1120 6 halaman. 4x u.2 port to pcie 3.0x16 nvme hba

HighPoint R1120 Panduan Instalasi Cepat
SFF-8643
SATA-15pin
SFF-8639
Step 4: Shown above is an SFF-8643 to U.2 SFF-8639 cable with a 15-
pin SATA power connector. Connect the R1120 to the NVMe
SSD's using the appropriate SFF-8643 cables. The SFF-8639
port should be connected to the NVMe SSD's U.2 port. The 15
pin SATA power connector should be connected the system's
power supply.
4