HighPoint R1000 Series Panduan Instalasi Cepat - Halaman 7
Jelajahi secara online atau unduh pdf Panduan Instalasi Cepat untuk Pengontrol HighPoint R1000 Series. HighPoint R1000 Series 9 halaman. 4x m.2 port to pcie 3.0 x8/x16 nvme hba's
Juga untuk HighPoint R1000 Series: Panduan Instalasi Cepat (8 halaman), Panduan Instalasi Cepat (10 halaman)
Step 6. Refasten the screw to secure the SSD.
Repeat Steps 3 to 5 to install the remaining SSD.
Note:
into each M.2 port. Loose connections can cause a variety of
stability and performance issues, and may ultimately result in
data loss.
The following example shows four SSD's installed into Ports 1 through
4:
Make sure the SSD's are carefully, but securely installed
7