Emerson FB2100 Manual Penggantian Lapangan - Halaman 9

Jelajahi secara online atau unduh pdf Manual Penggantian Lapangan untuk Peralatan Industri Emerson FB2100. Emerson FB2100 14 halaman. Flow computer i/o terminal board
Juga untuk Emerson FB2100: Manual Penggantian Lapangan (16 halaman), Manual Penggantian Lapangan (8 halaman), Manual Penggantian Lapangan (16 halaman), Manual Penggantian Lapangan (16 halaman)

Emerson FB2100 Manual Penggantian Lapangan
FB2100/FB2200 Flow Computer Doors/Accessories Field Replacement Guide
screwdriver. (Depending upon how it was wired at the factory, it may go to the DOOR
CONTACT terminal or to a digital input.) Set the old assembly aside.
4.
Take the new (replacement) door intrusion switch assembly and attach its wires to the
terminal block in the last step.
5.
Attach the door intrusion switch assembly to the flow computer enclosure using the hex
nuts. Torque nuts to 4 to 6 in lbs (0.5 to 0.7 N m).
6.
Close the flow computer enclosure.
Removing/Replacing the Aluminum Door Clamps
The aluminum flow computer enclosure includes six clamps along the edge of the door (two at the
top, two on the bottom, two at the side).
UL Field Installed Accessory Kit for Use in Class I, Division 2, Groups A, B, C, and D
Flow Computer Aluminum Door Clamp Field Installed Accessory Kit Part No. 399394-00-0
1.
To remove/replace a clamp, use a #3 Phillips-head screwdriver to remove the screw which
holds the clamp in place and set the old clamp aside. Save the screw.
D301825X012
November 2020
7