highwood Sequoia Professional Ridgecrest Panduan Perakitan - Halaman 16
Jelajahi secara online atau unduh pdf Panduan Perakitan untuk Perabotan Luar Ruangan highwood Sequoia Professional Ridgecrest. highwood Sequoia Professional Ridgecrest 16 halaman. Commercial grade
Top Slat (x8)
Upper Support Beam
Top
Slat
Index
29) Use the Top Slat Index to Set
the Location of the First Top Slat.
Set the Top Slat Index on Top of the
Joist as Shown Above, and Adust the
Top Slat Until it Rests Against the
Top Slat Index.
30) Secure the Top Slat to Each
Upper Support Beam and Each Joist
Using (7) D Screws. Each Top Slat
has Pre-Drilled Holes Which Will Align
with the Joists and Beams it Sets on.
Follow Step 29 Prior to Securing Each
Screw to Ensure the Top Slat
Remains Straight.
SEQUOIA
PROFESSIONAL
by
highwood
PERGOLA ASSEMBLY
28) Place the (8) Top Slats on
Top of, and Perpendicular to the
Joists and Upper Support Beams,
with the 45 Angle Facing Down.
For information on Care and Cleaning or to register your SEQUOIA
PROFESSIONAL product by highwood , please visit
www.highwood-usa.com.
Slat Spacer
31) To Set the Location of Each
Subsequent Top Slat, Use the Slat Spacer
to Set the Center-to-Center Distance
Between Top Slats. Use the Second Slat
Spacer to Maintain Proper Spacing of the
Joists as Shown Above. Move Each of the
Spacers Accordingly so they are Near the
Area of the Top Slat Being Secured. This
will Ensure all Slats Remain Straight and
Square with One Another.
32) Secure Each Remaining
Top Slat with (7) D Screws.
CM-PGLA-1212
04.30.21
PAGE 16 of 16