Galvin Engineering GalvinAssist 41992CP Panduan Instalasi - Halaman 3
Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Bantuan Kamar Mandi Galvin Engineering GalvinAssist 41992CP. Galvin Engineering GalvinAssist 41992CP 5 halaman. Cp hand shower with inverted rh t 700x1100 ss hygienic grab rail
Product Installation Guidelines
INSTALLATION
INSTALLATION COMPLIANCE: Galvin Engineering products must be installed in accordance with these
installation instructions and in accordance with AS/NZS 3500, the PCA and your local regulatory
requirements. Water and/or electrical supply conditions must also comply to the applicable national and/or
state standards. Failing to comply with these provisions shall void the product warranty and may affect
the performance of the product.
WARNING: Install with stainless
steel 304 or 316 screws. Other
type of screws may rust and void
warranty.
1. Install straight grab rails including the
horizontal section of any grab rail as per
AS 1428.1, 800-810mm from floor to top
of rail. Make sure the wall surface is flat
and free from contaminants.
3.
Remove flange protector from grab rail
flange. Align guide lug marks from step 2
and mark wall through base holes to
pinpoint screw holes.
© Galvin Engineering Pty Ltd
When marking out these grab
rails, use centre base holes of
flange protector.
2. For straight grab rails, position the flange
4. Fit dress ring if applicable. Drill spot
Version 1, 25
Version 1, 1 June 2022, Page 3 of 5
When marking out corner grab
rails follow the fixing guide lug
diagram shown above to suit grab
rail orientation.
protector guide lugs either vertical or
horizontal.
marks with 7mm bit. Screw wall mount
plate to wall. Ensure screws engage wall
stud or other solid substrate.
th
May 2022, Page 3 of 5