AGS Merlin 1000S Panduan Pemasangan & Pengoperasian - Halaman 4

Jelajahi secara online atau unduh pdf Panduan Pemasangan & Pengoperasian untuk Peralatan Laboratorium AGS Merlin 1000S. AGS Merlin 1000S 12 halaman. Gas utility isolation controller
Juga untuk AGS Merlin 1000S: Panduan Pengguna & Instalasi (10 halaman), Panduan Pemasangan, Pengoperasian, dan Pemeliharaan (10 halaman), Panduan Pemasangan & Pengoperasian (16 halaman)

AGS Merlin 1000S Panduan Pemasangan & Pengoperasian
Installation & Operation Manual

Installation

Planning

The Merlin 1000S gas pressure proving system is designed specifically for use in educational
establishments and laboratories.
This panel is to be used to carry out a gas-proving test on the pipe work in order to highlight if there is
a gas appliance open or a gas leak in a laboratory. The Merlin 1000S is designed to give the teacher
full control over the incoming gas supply with the lockable main key-switch.
The Merlin 1000S can work in conjunction with carbon dioxide, natural gas, carbon monoxide an d
LPG sensors. The Merlin 1000S also has a built in "timeout" facility which will automatically shut off
the gas solenoid valve at the end of a specific time period, this time period can be adjusted to 2, 5, 8
hours or can be overridden if required.
Please refer to your detector manual for important information regarding coverage, location and
positioning including areas and conditions to avoid.

Fixing - Mounting

Place the panel 48-60 inches above finished floor level.
Unpack all the parts!
Designed for surface mounting, it must be installed by a
licensed, insured contractor.
1. Carefully remove the front cover from the unit by
unscrewing the four bolts located at each corner.
To do this – use the socket wrench provided.
2. Mark the four screw holes located on the back of the enclosure to the wall. Ensure the wall surface is
flat to prevent base distortion.
3. After executing the mounting and the connections – replace the front cover and insert the security
caps over the four bolts.
Take care when making connections to high voltage connectors!
Any damage attempting to remove the circuit board may void any warranty!
All Class 2 wiring is to be installed within flexible tubing to maintain segregation between circuits!
Wiring of different circuits shall be separated by means of routing, clamping or barrier!
A flush mount kit is available, comprising of a mounting bracket and decorative surround strip. Contact
your supplier for more information.
Rev: 10
02-21
Merlin 1000S
4