AFL Hyperscale 6RU Panduan Instalasi - Halaman 15

Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Perangkat Keras Jaringan AFL Hyperscale 6RU. AFL Hyperscale 6RU 20 halaman. Front-access v-panel
Juga untuk AFL Hyperscale 6RU: Panduan Instalasi (12 halaman), Panduan Instalasi (16 halaman)

AFL Hyperscale 6RU Panduan Instalasi
Cable Installation
Repeat steps 25-30 for middle and top
31
drawers.
Attach front door to mounts with spring
plungers. Door pivots and latches closed with
33
swell latches. Stick relevant port label to rear of
door.
Series
Labels
U-Series 6RU Front-Access V-Panel (FVP)
Slide door mount bracket behind screw heads
32
and tighten. Repeat for other side.
© AFL Hyperscale. All rights reserved
15