AGT INDUSTRIAL AGT-B1000 Panduan Produk - Halaman 8

Jelajahi secara online atau unduh pdf Panduan Produk untuk Sistem Pengangkatan AGT INDUSTRIAL AGT-B1000. AGT INDUSTRIAL AGT-B1000 19 halaman. Two-post auto lift

package) if necessary.
5 . Tighten anchor bolts nuts in diagonal order (Foot Pounds of Torque: 90+, suggest to
use hand wrench to tighten nuts.)
Fig 8 Anchor Bolts Installation Diagram
2.2.8 Install Arms and Pulling Rod
Install arms and pulling rod (Fig 9 and Fig 10).
Page 8 of 19