IKEA Akurum kitchen Panduan Instalasi - Halaman 4
Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Perabotan Dalam Ruangan IKEA Akurum kitchen. IKEA Akurum kitchen 17 halaman. Kitchen
A little preparation can save a lot of time later
on—especially when it comes to installing your
kitchen.
Removing the old kitchen
Before removing old cabinets and countertops,
switch off the electricity, gas and water. Remove
base cabinets first, so that you can easily get to
the wall cabinets.
Checking for uneven spots
Flat, level surfaces are the best start for a good
installation. Take the time now to locate and cor-
rect uneven walls and floors. The first three
points on the step 3 poster show how to check. If
major problems need to be fixed,
you may want to hire a professional.
© Inter IKEA Systems B.V. 2004
Step 1. Prepare
your kitchen
Marking cabinet position
Measure and draw in the postion of your cabi-
nets on the wall so you can be sure everything
fits.
Mapping out utilities
If you're re-routing water or gas pipes or making
changes to electrical outlets, hire qualified spe-
cialists. They will do a safe and professional job.
Preparing the walls and floor
With the room empty, now is the time to prime
walls, put on a first coat of paint, and/or install
new flooring. Keep in mind, new flooring is easi-
er to install now, but be sure to protect the sur-
face until the kitchen is finished. The second coat
of paint and any wallpapering should be com-
pleted after the cabinets are installed.
4