agui OKATT DNP16-01 Manual Untuk Instalasi dan Penggunaan - Halaman 5

Jelajahi secara online atau unduh pdf Manual Untuk Instalasi dan Penggunaan untuk Sistem Pengangkatan agui OKATT DNP16-01. agui OKATT DNP16-01 9 halaman. Pivoting buffer support

DNP16-01
By: E. Irazu.
Reviewed by: J. Fernández
Marking and drilling of fixture points:
Once the height has been adjusted, position and mark the drill holes
required to fix the buffer support to the walls. The fixture points are:
-2 in the pit, on the lateral support slots.
-4 on the unit at two heights (2+2), on the upper and lower slots.
(The wall plugs used must guarantee that each fixture can
withstand a tensile load of 75 kg.)
It is important to choose appropriate wall plugs for the type of space
and to follow manufacturer's directions for proper installation. It is
essential to observe the torque value, which will vary depending on
model and manufacturer.
Plumbing and fixing the buffer support.
Reposition the buffer support and, checking that the whole installation is perfectly level on all sides, tighten
the fixtures and check all levels again.
For the levelling and adjusting if necessary, use side supports and the chocks provided in the bag of
accessories.
Fixtures or chocks are used to level the mechanism
and can compensate for any irregularities in the pit.
It is important that they are mounted in the position
indicated in this manual and to check that the tube
fits tightly against them when inactive.
The image shows to possible arrangements, using
fixtures for 35-80 and with chocks for smaller
measurements.
MANUAL FOR INSTALLATION AND USE
DNP16-01. PIVOTING BUFFER SUPPORT
BRAND PRODUCT
DEPARTMENT
Rev:2
5