Majestic fireplaces UVDC Panduan Pemasangan dan Pengoperasian Pemilik Rumah - Halaman 5

Jelajahi secara online atau unduh pdf Panduan Pemasangan dan Pengoperasian Pemilik Rumah untuk Perapian Dalam Ruangan Majestic fireplaces UVDC. Majestic fireplaces UVDC 12 halaman. Ventless fireplaces

3a
Combustible Per-
pendicular Wall
3b
Clearances
without Canopy
Noncombustible
Material
9¹⁄₂"
Min.
Fireplace
Opening
Fig. 3 Clearances to combustibles.
fireplace opening approximately 5" to the right
and left from center. Two (2) screws are located
4" down from the top on each side of the fireplace
opening. Place the canopy, making sure the 1/4"
FP604a
hex head screws across the top of the opening
clearances
align with the clearance holes in the canopy. Se-
2/04
cure with the four (4) previously removed screws.
WARNING: The firebox canopy must not be modified
or replaced with a canopy that may be provided with
the unvented decorative room heater.
4. Floor Clearances: No clearance is required if the
appliance is installed per these instructions.

Installing the Firebox

This list of specific instructions will help you make cer-
tain that every installation operation is done correctly.
Complete the installation steps in the sequence shown.
LOCAL BUILDING CODES SHOULD BE CONSULTED
IN ALL CASES AS TO THE PARTICULAR REQUIRE-
MENTS CONCERNING THE INSTALLATION OF FAC-
TORY BUILT FIREPLACES.
Select the location for the fireplace by taking into con-
sideration the factors previously outlined in the Planning
Ahead section of the manual.
Step 1: Framing the Firebox
The width of the framed opening must be 39" for 36"
models or 45" for 42" models. (Fig. 4)
20007433
42"
5" Min.
10"
6"
24"
Min.
16"
Min.
1"
FP604b
Clearance to Combustible
3c
Mantel Projections with-
out Canopy
24
22
20
18
16
14
12
10
8
2
4
6
8
Mantel (Combustible)
Projections (")
T225
The entire fireplace can be elevated above the floor
to achieve a raised hearth effect. This can be done by
adding a small platform to achieve the desired height.
NOTE: If installing a blower kit on the fireplace, the
lower grille must be even with the floor. The wiring re-
quired for the lower blower must be installed during the
framing stage. See blower kit installation instructions for
wiring requirements. The nailing flanges on both sides
were designed to allow the installation of
board or plywood flush with the face of the fireplace.
Step 2: Install the Firebox
Install the firebox into the framed opening by setting
it directly in front of the opening and sliding it into the
proper position.
Step 3: Level the Firebox
Check the level of the firebox on the top edge of the fire-
place face. Shim if necessary.
Step 4: Secure the Firebox
Four (4) nailing flanges are supplied with the fireplace
(found on the fireplace hearth). To level the box and
secure it firmly in place, remove the nailing flanges from
the hearth and install at the sides of the fireplace as
shown in Figure 5.
NOTE: The nailing flanges have two (2) sets of holes
to allow for adjustment for 1/2" or 5/8" offset of the face
of the unit. When installing the nailing flanges, choose
the set of holes on the nailing flange that fit with your
application.
UVDC/UVDR Series Unvented Fireplaces
Clearance to Combustible
3d
Mantel Projections with
Canopy
22
20
18
16
14
12
10
8
6
10
Mantel (Combustible)
Projections (")
*Combustible Projections above the
fireplace must be within the area
described by the dashed line when
the firebox is equipped with the heat
reducing canopy.
T225
mantel clearance
2/04
2
4
6
8
10
1/2" wall-
5