Centrometal Cm Pelet-set 90 Petunjuk Teknis - Halaman 11

Jelajahi secara online atau unduh pdf Petunjuk Teknis untuk Kompor pelet Centrometal Cm Pelet-set 90. Centrometal Cm Pelet-set 90 12 halaman.

8. Initial setting of the regulation

8.1. Setting the configuration

1. In main screen press "Menu" button
3. In "Installation" menu press "Commissioning"
button
5. In "Configuration" menu press "Configuration"
button"
7. Set scheme (current "B.0.0.")
Confirm it with OK button (blue button)
Technical instructions for the commissioning and adjustment
2. In "Main" menu press "Installation" button
(SERVICE PIN required)
4. In "Commissioning" menu" press
"Configuration" button
6. In "Configuration" menu set scheme
1 – scheme "CODE" (3 characters)
2 – buttons for changing the values
3 – scheme description
11