Centrometal EKO-CK P 20 Penggunaan dan Pemeliharaan - Halaman 19
Jelajahi secara online atau unduh pdf Penggunaan dan Pemeliharaan untuk Kompor pelet Centrometal EKO-CK P 20. Centrometal EKO-CK P 20 20 halaman. Cm pelet-set (14-35 kw)
![Centrometal EKO-CK P 20 Penggunaan dan Pemeliharaan](/uploads/products/server2/2048363/2048363.jpg)
The following components must be thoroughly checked/cleaned:
-
Clean thoroughly burner, grate...
-
Clean photo-cell
-
Empty and clean pellet tank
-
remove and clean pellet feeder
Cleaning frequency of above items depends on pellet quality and it should be adjusted accordingly
-
Check flexible connecting tube and place it so that flexible pellet feeding tube is inclined
toward the burner so that pellets can fall freely into the burner,
-
Check wires and connections and replace them when required.
12. The possibility of fan lid installing
Burners CPPL-14 and CPPL-35 which have connectors for electrical connections built-in below burner
cover, which power lines in safety rail to connectors are coming from burner bottom (see schemes in
this manuals) not the through cover side of burner cover are factory predicted for subsequent
istallation possibility of fan lid.
Fan lid must subsequently fitted by authorized service by Centrometal with autorization for this type of
product or Centrometal service.
Subsequent installation of fan lid include installation of fan lid assembly to burner, electrical wiring of
burner and installation of electronical board with wiring to boiler control unit.
Subsequent installation can be done on place where is burner mounted or Centrometal factory.
With purchasing fan lid for subsequent installation are received all part which is needed to install.
Technical instructions Cm Pelet-set
19