Gamma PROGRESSION 600ES-LED Panduan Pemilik - Halaman 10

Jelajahi secara online atau unduh pdf Panduan Pemilik untuk Mesin Merangkai Gamma PROGRESSION 600ES-LED. Gamma PROGRESSION 600ES-LED 17 halaman.

Gamma PROGRESSION 600ES-LED Panduan Pemilik
STRINGING THE FRAME
Weaving the Cross Strings
Weave the cross strings over and under the
main strings being careful to alternate the
weave direction of each consecutive cross
string so as to be opposite of the previously
installed cross string.
Once the final cross string is tensioned and
clamped, tie off at the appropriate hole speci-
fied by the racquet manufacturer.
9