ADF 1000 NMV LINEA ZERO CLEARANCE BOX ASSEMBLY INSTRUCTIONS
1/11/19
Note the tabs in the base side rails can also be used to fix the frame to the
floor. Ensure the base is secured to the floor, using fixings appropriate for the
flooring structure.
The floor must be able to support the weight of the heater, flue and fuel load
approx. 300kg
Step 3.
Screw the base panel of the Zero Clearance
box to the stand base, using the self tapping
machine thread screws. Then take the ZCB
side panel, and put one of the screws
through the side and the base panel. The
side panel should be inside the base panel
fold. Then slide the back panel into the
inside of the base panel rear fold, and on the
outside of the side panel. Add screws but
don't fully tighten until the top panel is on.
Repeat for the other side panel.