Gamma X-ST Panduan Pemilik - Halaman 10

Jelajahi secara online atau unduh pdf Panduan Pemilik untuk Mesin Merangkai Gamma X-ST. Gamma X-ST 19 halaman.
Juga untuk Gamma X-ST: Panduan Pemilik (19 halaman), Panduan Pemilik (19 halaman)

Gamma X-ST Panduan Pemilik
STRINGING THE FRAME
Weaving the Cross Strings
Weave the cross strings over and under the
main strings being careful to alternate the
weave direction of each consecutive cross
string so as to be opposite of the previously
installed cross string.
Completing the String Job
Once the final cross string is tensioned and
clamped, tie off at the appropriate hole
specified by the racquet manufacturer.
Remove the frame from the mounting sys-
tem by loosening the shoulder supports and
frame supports.
9