deconta C 130 L Buku Petunjuk - Halaman 9
Jelajahi secara online atau unduh pdf Buku Petunjuk untuk Sistem Air deconta C 130 L. deconta C 130 L 15 halaman. Water treatment boiler system
6.2 Version with 2nd sewage pump for 2nd shower
Cold water
Shower 1
Warm water
Shower 1
Sewage OUT
Unplug
Establish hose connections:
o Optionally connect „water inlet" with mains system or fill tank manually via
filling
o Connect „Warm water Shower 1" with shower roof
o Connect „Cold water shower 1" with cold water connection of shower roof (if
present)
o Connect „Warm water Shower 2" with shower roof
o Connect „Cold water Shower 2" with cold water connection of shower roof
(if present)
o Connect „Sewage IN 1" with shower floor
o Connect „Sewage IN 2" with shower floor
o Connect „Sewage OUT 1" with sewerage
o Connect „Sewage OUT 2" with sewerage
Fill waste water pump with water
Fill Filter housing of 220µ Filter with water
Fasten cap nut of filter housing hand tight
Connect to power
Instruction manual
Water treatment boiler system C 130 L
Water inlet
Sewage IN 2
Cold water
Shower 2
Warm water
Shower 2
Sewage IN 1
page 9