Cequent PRO Series Manual

Jelajahi secara online atau unduh pdf Manual untuk Aksesori Sepeda Cequent PRO Series. Cequent PRO Series 6 halaman. Axis 3 bike carrier
Juga untuk Cequent PRO Series: Manual (12 halaman), Petunjuk Manual (9 halaman), Petunjuk Manual (9 halaman)

Cequent PRO Series Manual
Kit Contents:
Main Support Assembly
Upper Support Tube
Lower Support Tube
Upper / Lower Hook Straps
Cradle Strap
Rubber Pads
Assembly Instructions:
1.
Align mounting holes of upper support tube with holes in main support assembly. Use a supplied
¼ carriage bolt and ¼ Nylon locking nut to fasten upper support tube to main support.
DO NOT OVER TIGHTEN. Support tube must be able to rotate freely. (Fig. 1)
See Figure 2 to determine upper and lower support tube.
2.
Align mounting holes in upper support tube with adjustment slot in main support assemble.
Use a supplied ¼ carriage bolt and adjustment knob, to fasten tube to main support. (Fig. 1)
3.
Repeat steps 1 & 2 for lower support tube.
FIGURE 2
Cequent
49 Pacific Drive
Keysborough
VIC 3173
DESCRIPTION:
1
1
1
4
6
6
LOWER SUPPORT TUBE
(WIDE)
ITEM:
PRO2000
Axis 3 Bike Carrier
Side Cam Buckle Straps
Boot Hook
Adjustment Knobs
¼" x 1 ½" Carriage Bolt
¼" Lock Nut
UPPER SUPPORT TUBE
(NARROW)
2
2
4
8
4
Issue A
2/04/12
Page 1 of 6