GREEN POWERLINK M9PG040000 Panduan Pengguna - Halaman 14

Jelajahi secara online atau unduh pdf Panduan Pengguna untuk Otomatisasi Rumah GREEN POWERLINK M9PG040000. GREEN POWERLINK M9PG040000 17 halaman. On-line energy management solution

Outgoing Server Setup

The energy gateway can collect energy database and transmit onto designated
server for energy management service.
1. Click on "Server" in the energy gateway operating page.
2. Enter the designated server information and transmission time interval.
3. Click on "Apply" to perform confirm server setting setup.

Reset the Energy Gateway to Factory Default

There are two ways to reset the energy gateway to factory default, please follow
the instruction below to reset the gateway to its factory default setting.
Warning:
By performing resetting the gateway to factory default, all saved data,
network settings & channel settings will be restored to factory default.
Reset to factory default from the energy gateway
1. Locate the reset point on the gateway.
2. Push a stylus or pen into the reset point for 5 seconds.
3. The gateway will be hard reset to factory default setting. Please perform all the
necessary setup and channel setting.
GREEN POWERLINK On-Line Energy Management Solution V1.0

Reset to factory default from energy gateway web server

1. Click on the "Defaults" in the energy gateway operation page.
2. Clink on the "Apply" to reset to factory default.
3. The gateway will be hard reset to factory default setting. Please perform all the
necessary setup and channel setting.

Browse and access Gateway from internet

Anywhere and anytime, user can browse energy consumption
of the connected appliances and control power
on/off from internet.
Smart Socket
2-Way RF
Gateway
24
GREEN POWERLINK On-Line Energy Management Solution V1.0
Access the gateway
from internet
Internet
Router w/NAT
Internet
Service
Provider
25