Garage Tek GT100010A Panduan Instalasi - Halaman 4

Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Penyimpanan Garage Tek GT100010A. Garage Tek GT100010A 16 halaman. Garage overhead storage racks

Garage Tek GT100010A Panduan Instalasi
STEP 1: 4FTX 4FT & 4FTX 8FT RACK-FOR CEILING BRACKET INSTALLATION (WOOD JOIST)
WE PROVIDED WOOD SCREWS AND SOLID CONCRETE CEILING ANCHORS FOR THIS INSTALLATION.
PLEASE DETERMINE THE TYPE OF CEILING YOU HAVE BEFORE STARTING.
WOOD JOIST:
A: USE A STUD FINDER TO LOCATE THE CEILING WOOD JOISTS.
NOTE: USE THE DRILL TEMPLATE TO MARK THE MOUNTING HOLES FOR INSTALLATION.
A1: START FROM THE LEFT, PLACE THE DRILL TEMPLATE AND MARK THE (2) HOLES AT CENTER OF THE JOIST LOCATIONS.
A2: FROM THE (1) END MEASURE 48", PLACE THE DRILL TEMPLATE AND MARK THE NEXT SET OF (2) HOLES.
A3: FOR 4FT X 8FT RACK ONLY, MEASURE 48" OVER, PLACE THE DRILL TEMPLATE AND MARK THE NEXT SET OF (2) HOLES.
B: PILOT HOLES FOR WOOD JOIST: USE A 11/64" (4.5mm) DIA. DRILL BIT AND DRILL A 2 3/8" (60mm) DEEP HOLE FOR
EACH SCREW.
C: FASTEN THE CEILING BRACKETS WITH THE WOOD SCREW. USE A DRILL & SUPPLIED NUT DRIVER.
48.000in
1219.20mm
REUSE THE DRILL TEMPLATE TO MARK MOUNTING HOLES ON THE CEILING
CEILING JOISTS
DRILL MARKED MOUNTING HOLES
(2) MOUNTING HOLES REQUIRED
PER CEILING BRACKET
KEEP EACH SET OF CEILING BRACKETS IN A STAIGHT LINE
48.000IN
[1219.20mm]
11/64"
[
4.5mm]

MOUNTING HOLE DIMENSIONS

MARKED MOUNTING HOLE
WITH PENCIL
WOOD
SCREW
WOOD
SCREW
2 3/8"
[60mm]
48.000in
1219.20mm
FOR 4FT X8FT RACK
ONLY
FOR 4FT X8FT RACK
ONLY
CEILING
JOIST
CEILING
BRACKET
SUPPLIED
NUT DRIVER
DRILL
PAGE 4