CORNING CCH-CF Panduan Memulai Cepat - Halaman 8
Jelajahi secara online atau unduh pdf Panduan Memulai Cepat untuk Perangkat Keras Jaringan CORNING CCH-CF. CORNING CCH-CF 11 halaman. Splice cassette and slack cassette for closet connector housings
Juga untuk CORNING CCH-CF: Panduan Memulai Cepat (12 halaman)

6
Route as
shown.
11
Place ribbons in tube;
secure with cable tie.
Store heatshrink tube
in splice organizer.
14
Route as
shown.
STANDARD RECOMMENDED PROCEDURE 003-895 | ISSUE 1 | OctOber 2011 | PAGE 8 OF 11
Bring pigtail ribbon from
5
bottom layer into top layer.
10
Route as
shown.
Route ribbon
9
to bottom layer.
15
Store heatshrink tubing
in splice organizer.
18
Store ribbon in
slack storage area
on bottom layer.
Apply heat to heatshrink tube.
Slide heatshrink tube
7
onto ribbon up to jacket.
12
Close cover.
16
17
Loosely secure ribbon with cable tie.
8
Splice per the
13
instructions
provided with
the splice
equipment.
Cut ribbons in center of
organizer.
TPA-3941
TPA-3942