Makita 6226DW Buku Petunjuk - Halaman 10

Jelajahi secara online atau unduh pdf Buku Petunjuk untuk Bor Makita 6226DW. Makita 6226DW 19 halaman. 9.6 v i2 v 14.4 v
Juga untuk Makita 6226DW: Buku Petunjuk (19 halaman), Buku Petunjuk (19 halaman), Buku Petunjuk (19 halaman)

Makita 6226DW Buku Petunjuk
Speedchange
To change the speed, first switch off the
tool and then slide the speed change lever
to the
"11"
side for high speed or "I" side
for low speed. Be sure that the speed
change lever is set to the correct position
before operation. Use the right speed for
your job.
Low
speed
High speed
Speed
change lever
I
CAUTION:
*Always set the speed change lever fully to the correct position. If you operate the tool
with the speed change lever positioned half-way between the "I" side and
"11"
side, the
tool may be damaged.
Do not use the speed change lever while the tool is running. The tool may be damaged.
Adjusting the fastening torque
The fastening torque can be adjusted in 17
steps by turning the adjusting ring so that
its graduations are aligned with the pointer
on the tool body. The fastening torque is
minimum when the number
1
is aligned
with the pointer, and maximum when the
El
marking is aligned with the pointer.
The clutch will slip at various torque levels
when set at the number 1 to 16. The clutch
is designed not to slip at the
fl
marking.
Before actual operation, drive a trial screw
into your material or a piece of duplicate
material to determine which torque level is
I
Adjusting ring
Drill marking
Pointer
Graduations
Adjusting ring
Drill marking
Pointer
Graduations
pired for
a
particular application.
pired for
a
particular application.
NOTE:
*Do not operate the tool with the adjusting ring set between the number 16 and the
B
marking. The tool may be damaged.
10