Installation Instructions

Step 1. Install to process valve
Be sure the ball valve to the process line is closed
}
Apply a thread sealant, such as Teflon
}
Install the probe into the process ball valve using a 1-3/8" open end wrench ONLY on the lowest wrench flats on the base, nearest to the NPT
}
male threads (see Figure 1)
Step 2. Pressurize the probe
Be sure the vent valve in the auxiliary port is closed (see Figure 1)
}
Slowly open the ball valve to the process (see Figure 2)
}
Step 3. Lowering the probe to proper depth
Decide the depth needed for the probe (D1) by determining from the top of the full port process ball valve to the desired end of the probe in
}
the pipeline (see Figure 4)
Apply the depth (D1) to the probe from the top of the base up the threaded rod to determine the lowering stopping point (see Figure 3)
}
Install the 2 depth marking nuts on the threaded rod at the predetermined lower stopping point. Using 2 7/8" open end wrenches, rotate the
}
upper nut clockwise and the lower nut counterclockwise simultaneously until the nuts are locked firmly in place.
Lower the probe to the proper depth by using a 7/16" open end wrench only on the wrench flats of the threaded rod of the probe (Figure 5).
}
Step 4. Leak testing the probe connections
Using a leak detector, check for leaks at the following locations: process connection, probe packing seal, and additionally any other
}
connection made during the probe installation.
If leaking occurs through the probe packing gland, use a 1 3/16" open end wrench to tighten the packing seal plug until the leak stops. DO
}
NOT OVERTIGHTEN.
Figure 1
Figure 2
Vent
Valve
Tape, to the male threads on the bottom of the probe
®
Figure 3
D1
3
Figure 4
Figure 5
D1
©
2010 A+ Corporation, LLC. All rights reserved.
SCC-752-InsInstallationOperation_0514