Fujitsu SPARC Enterprise T5120 Panduan Memulai - Halaman 4
Jelajahi secara online atau unduh pdf Panduan Memulai untuk Server Fujitsu SPARC Enterprise T5120. Fujitsu SPARC Enterprise T5120 12 halaman. Sparc enterprise
Juga untuk Fujitsu SPARC Enterprise T5120: Panduan Ikhtisar (34 halaman), Panduan Memulai (12 halaman), Panduan Perencanaan Lokasi (26 halaman), Manual Keselamatan dan Kepatuhan (34 halaman)
4. (Optional) Connect an Ethernet cable between the server's NET MGT port (
which future connections to the SP and host will be made.
After the initial configuration of the system using the SER MGT port, communication with the SP and host is
usually performed through this Ethernet interface.
5. Connect an Ethernet cable between one of the server's NET ports (
server will communicate.
6. Build and connect your DC power cables into the server power supplies and into separate power sources.
Instructions for building the DC power cables are in the SPARC Enterprise T5120 and T5220 Servers
Installation Guide.
To provide redundancy, plug both power supplies into separate power sources. Note that the system can
operate with only one power connection, but there is no redundancy in this case.
When power is applied, the SP initializes and power supply LEDs illuminate. After a few minutes, the SP
login prompt appears on the terminal device. Note that the host is not initialized or powered on yet.
7. At the terminal device, log in to the SP as root with a password of changeme.
SUNSP00144FAC732F login: root
Password: changeme
. . .
->
After a brief delay, the SP prompt is displayed (->).
At this point, there are many commands you can perform using the Integrated Lights Out Manager interface.
For example, to create a user named admin, and to set the admin account role to Administrator and the
CLI mode to alom, enter:
-> create /SP/users/admin role=Administrator cli_mode=alom
Creating user...
Enter new password: ********
Enter new password again: ********
Created /SP/users/admin
Note that the asterisks in the example will not appear when you enter your password.
In the future, when you log in to the admin account, you use the ALOM CMT compatibility command set. In
the meantime, you are using the default ILOM command set.
Additional SP information, such as how to change the password and how to set up the SP network
parameters, is available in the online documentation set.
8. Power on the server and redirect the host output to display on the serial terminal device:
-> start /SYS
Are you sure you want to start /SYS (y/n)? y
-> start /SP/console
Are you sure you want to start /SP/CONSOLE (y/n)? y
Serial console started. To stop, type #.
. . .
After you start the SP console, the server initialization takes approximately 20 minutes to complete.
) and the network to
FIGURE 2
) and the network to which the
FIGURE 2