Kohler VIA K-20645T-BW Panduan Petunjuk Instalasi - Halaman 4
Jelajahi secara online atau unduh pdf Panduan Petunjuk Instalasi untuk Produk Pipa Kohler VIA K-20645T-BW. Kohler VIA K-20645T-BW 30 halaman. Vitreous china wall-hung p-trap toilet
Juga untuk Kohler VIA K-20645T-BW: Panduan Petunjuk Instalasi (11 halaman), Panduan Petunjuk Instalasi (24 halaman), Panduan Petunjuk Instalasi (38 halaman), Panduan Petunjuk Instalasi (28 halaman)
3. ATTACH CONNECTION PIPE
1) Attach inlet pipe which set aside the length to the
concealed tank.
2) Attach outlet pipe to the toilet.
3) You may apply some lubricant to help connect smoothly.
See Fig. #4.
4) Please tilt the outlet pipe a little after it is installed to
prevent water storage.
Inlet
Fig.#4
4. INSTALL THE NEW TOILET
1) Install the accessory kit into the installing hole.
2) Place the new toilet on the wall through the carrier.
3) Use wrench to tighten accessories and level the toilet.
Then finish fixation.
4) Insert the cap into installing hole. See Fig. #6.
1132463-T01-D
See Fig.#5.
Outlet
4
3.
1)
2)
3)
4)
1
4.
1)
2)
3)
4)
Fig.#6
6
-4-
4
Fig.#5
5
6
5