Kohler VIA K-20645T-BW Panduan Petunjuk Instalasi - Halaman 5

Jelajahi secara online atau unduh pdf Panduan Petunjuk Instalasi untuk Produk Pipa Kohler VIA K-20645T-BW. Kohler VIA K-20645T-BW 28 halaman. Vitreous china wall-hung p-trap toilet
Juga untuk Kohler VIA K-20645T-BW: Panduan Petunjuk Instalasi (30 halaman), Panduan Petunjuk Instalasi (11 halaman), Panduan Petunjuk Instalasi (24 halaman), Panduan Petunjuk Instalasi (38 halaman)

Kohler VIA K-20645T-BW Panduan Petunjuk Instalasi
4. Install The New Toilet
1) Install the accessory kit into the installing hole.
2) Place the new toilet on the wall through the carrier.
3) Use wrench to tighten accessories and level the toilet.
Then finish fixation.
4) Insert the cap into installing hole. See Fig. #6.
5. Apply sealant to make sure the bowl
wall. See Fig. #7.
6. Install the toilet seat according to its installation instructions.
1132463-T01-G
Fig.#6
6
,
s edge seals to the
Fig.#7
7
-5-
4.
1)
2)
3)
4)
5.
6.
6
7