Kohler Chablis K-2081 Panduan Petunjuk Instalasi

Jelajahi secara online atau unduh pdf Panduan Petunjuk Instalasi untuk Perlengkapan Kamar Mandi Kohler Chablis K-2081. Kohler Chablis K-2081 13 halaman. Vitreous china pedestal lavatory
Juga untuk Kohler Chablis K-2081: Panduan Instalasi (16 halaman), Panduan Pemilik Rumah (12 halaman)

Kohler Chablis K-2081 Panduan Petunjuk Instalasi
R
BEFORE YOU BEGIN
NOTES
S
Observe all local plumbing and
building codes.
S
Prior to installation, unpack the
new lavatory and inspect it for
damage. Return the lavatory to
its protective carton until you are
ready to install it.
ROUGHING-IN
(S) Supply 9" (22.9cm) (Based on
12" (30.5cm) riser which may require
cutting).
(T) Pop-up drain typically 14-1/4"
(36.2cm).
FINISHED WALL
4" (10.2cm)
8-3/8"
(21.3cm)
19"
(48.3cm)
7"
(17.8cm)
1/2" D. MOUNTING
HOLE IN PEDESTAL
1/2"
FAUCET SHELF
(1.3cm)
(S)
8-5/8"
(T)
(21.9cm)
3/8" HOT
4" (10.2cm)
32-1/4"
(81.9cm)
1-1/4" OUTLET
Español, Página 5
A
1010420-2-
Français, Page 9
VITREOUS CHINA
PEDESTAL LAVATORY
S
These instructions are for
installing the lavatory to wood
frame construction. For other
installations, supply suitable
bracing and fastening devices of
sufficient size and strength.
S
The walls and floor must be
square, plumb, and level.
Fixture dimensions are nominal and
conform to tolerances in ASME
Standard A112.19.2M.
K-2081-4
19-1/4" (48.9cm)
4" (10.2cm)
4" (10.2cm)
2-5/8"
(6.7cm)
24" (61cm)
HANGER
13-1/4" (33.7cm)
C
8-1/4"
L OF BACKING
(21cm)
1-5/8"
(4.1cm)
1/2" D. ANCHOR
29-1/2"
HOLES
(74.9cm)
3/8" COLD
FINISHED FLOOR
CHABLIS
K-2081
K-2081-8
4" (10.2cm)
2-5/8" (6.7cm)
K-2081-1
2-5/8" (6.7cm)
5" (12.7cm)
FINISHED
WALL
E2001 Kohler Co.
1 1