Kohler Freshman K-4989-R Panduan Instalasi - Halaman 3

Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Perlengkapan Kamar Mandi Kohler Freshman K-4989-R. Kohler Freshman K-4989-R 20 halaman. Urinal
Juga untuk Kohler Freshman K-4989-R: Panduan Pemeliharaan (9 halaman)

Kohler Freshman K-4989-R Panduan Instalasi
2-1/4"
(5.7 cm)
3/4" Spud
Min
12-1/2"
(31.8 cm)
2" NPS Tap
6-3/4"
(17.1 cm)
17-1/4"
(43.8 cm)
Roughing-In Dimensions (Top Spud)
• Roughing-in dimensions are identical if using an optional 3"
outlet spud.
Kohler Co.
10"
16-1/4" (41.3 cm)
(25.4 cm)
14-1/4"
(36.2 cm)
24"
(61 cm)
24"
(61 cm)
1/4" (6 mm)
3
35-1/2"
(90.2 cm)
To Floor
2" NPS Tap
6" (15.2 cm)
Outlet Detail
1020646-2-C