Kohler Iron Works K-7104 Panduan Instalasi - Halaman 4

Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Perlengkapan Kamar Mandi Kohler Iron Works K-7104. Kohler Iron Works K-7104 28 halaman. Bath drain
Juga untuk Kohler Iron Works K-7104: Panduan Pemilik Rumah (21 halaman)

Kohler Iron Works K-7104 Panduan Instalasi
Overflow
Gasket
Ell
Tube
2. Install the Overflow Ell
Attach the gasket to the overflow ell.
The tapered side should be facing out, and the thin edge should
be on top when the gasket is properly positioned.
Align the overflow ell with the overflow hole in the bath.
From inside the bath, securely tighten the retainer nut to the
overflow ell.
089671-2-AC
4
Retainer
Nut
Kohler Co.