Kohler Jarves K-5055 Panduan Instalasi - Halaman 3

Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Perlengkapan Kamar Mandi Kohler Jarves K-5055. Kohler Jarves K-5055 17 halaman. Urinals
Juga untuk Kohler Jarves K-5055: Panduan Pemeliharaan (9 halaman), Panduan Pemeliharaan (10 halaman)

Kohler Jarves K-5055 Panduan Instalasi

Roughing-In Dimensions

• * The urinal complies with ADA requirements when the rim is
mounted no higher than 17" (43.2cm) from the finished floor.
• (T) Drain is typically 11-7/8" (30.2cm).
1. Preparation
Turn the water supply off.
Install or relocate the supply tubing and waste pipe as necessary to
conform to the roughing-in dimensions.
Install the shut-off valve.
Install adequate support framing as needed.
2. Install the Urinal
Install the hangers according to the roughing-in illustration.
Apply thread sealant tape to the pipe threads and install the female
collar to the waste pipe.
Place the gasket onto the female collar with the beveled surface
facing away from the collar.
Kohler Co.
3
1020644-2-A