Kohler K-12009 Panduan Instalasi dan Perawatan - Halaman 23

Jelajahi secara online atau unduh pdf Panduan Instalasi dan Perawatan untuk Perlengkapan Kamar Mandi Kohler K-12009. Kohler K-12009 50 halaman. Showerheads
Juga untuk Kohler K-12009: Panduan Instalasi dan Perawatan (17 halaman), Panduan Instalasi dan Perawatan (32 halaman)

Kohler K-12009 Panduan Instalasi dan Perawatan
2-7/16"
(62 mm)
3-3/4" (95 mm)

1. Prepare the Site

Provide a 2-7/8" (73 mm) to 3-1/8" (79 mm) diameter hole in the
wall material for the plaster guard.
Route a 3/4" mixed water supply line to the transfer valve
location.
Apply thread sealant to the inlet port threads and connect the
water supply to the valve inlet.
Two-Way: If two accessories will be attached to the valve, go to
the "Two-Way Installation" section.
Three-Way: If three accessories will be attached to the valve, go
to the "Three-Way Installation" section.
Kohler Co.
Plaster Guard
Max
Finished
Wall
Inlet
Mixed Water
Min
Supply 3/4" Copper
Finished
Tubing or Piping
Wall
3
1205548-2-B