Kohler Vanity K-2604 Panduan Instalasi dan Perawatan - Halaman 5
Jelajahi secara online atau unduh pdf Panduan Instalasi dan Perawatan untuk Perlengkapan Kamar Mandi Kohler Vanity K-2604. Kohler Vanity K-2604 41 halaman. Vanity
Juga untuk Kohler Vanity K-2604: Panduan Instalasi dan Perawatan (37 halaman)
Finished
Wall
Leveler
2. Secure the Vanity
CAUTION: Risk of property damage. Select 250 lb (113.4
kg) load bearing 5/16" lag bolts with a length to clear
obstacles in the wall and 5/16" washers. Calculate proper lag
bolt length by adding the following: 1-1/2" (38 mm) backing
material + wallboard thickness + back rail thickness.
IMPORTANT! Risk of product damage. Use care when moving the
vanity to avoid impacting, sliding, or side-loading the legs.
With assistance, lift and place the vanity in position against the
finished wall. Do not drag the vanity into position.
Verify the vanity is level and the back rail is plumb against the
wall. If necessary, turn the leveler(s) to adjust the unit.
Using a 1/4" drill bit, drill pilot holes through the back rail and
the finished wall. Verify the pilot holes are positioned to ensure
the lag bolts will engage the 2x6 backing material.
Secure the vanity to the wall with two 5/16" lag bolts and
washers (not provided).
Install the Bridge Cabinet (Optional)
Refer to the installation instructions packed with the K-2607
bridge cabinet.
Kohler Co.
Back Rail
Washer
Lag Bolt
Pilot
Hole
5
1267640-2-A