Kohler Vintage K-7159-PB Panduan Instalasi - Halaman 7

Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Perlengkapan Kamar Mandi Kohler Vintage K-7159-PB. Kohler Vintage K-7159-PB 21 halaman. Bath drains

Stopper
Jam Nut
Lift Toggle
5. Adjust Drain Stopper
- If adjustment is required, remove the stopper assembly from the drain
and loosen the jam nut below the stopper. Turn the jam nut
counterclockwise to raise the stopper or clockwise to lower the stopper.
- Tighten the nut.
- If sufficient clearance cannot be obtained by adjusting the stopper,
remove the lift rod assembly and loosen the locknut.
- Rotate the turnbuckle counterclockwise to lengthen the lift rod or
clockwise to shorten the lift rod.
- Tighten the locknut, reinstall the lift rod assembly and check the
clearance.

6. Installation Checkout

- Ensure that all connections are tight.
- Open the drain.
- Turn on main water supply and check for leaks. Repair as needed.
Kohler Co.
Turnbuckle
7
Lift Rod
Locknut
Spring
A
1018153-2-