Kohler K-1112 Panduan Instalasi - Halaman 9

Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Bak mandi Kohler K-1112. Kohler K-1112 48 halaman. Bath with airjets
Juga untuk Kohler K-1112: Panduan Pemilik Rumah (32 halaman), Panduan Pemilik Rumah (29 halaman), Manual (4 halaman), Panduan Pemilik Rumah (36 halaman), Panduan Instalasi (44 halaman), Manual Pengasahan Awal (Roughing-In) (4 halaman), Panduan Instalasi (48 halaman), Panduan Instalasi (44 halaman), Panduan Pemilik Rumah (29 halaman)

Kohler K-1112 Panduan Instalasi
GFCI-Protected
Receptacle

6. Make Electrical Connections

DANGER: Risk of electric shock. Connect the blower motor to a properly grounded,
grounding-type receptacle protected by Ground-Fault Circuit-Interrupters (GFCI's) or Residual
Current Devices (RCD's). Do not remove the plug grounding pins. Do not use grounding adapters.
NOTE: The bath with airjets model number is printed on a label near the blower motor. This label also
identifies the electrical rating.
Your Kohler bath with airjets is equipped with a cord and plug. The blower motor has been wired
at the factory. A licensed electrician must install a dedicated GFCI-protected, 120 V, 15 A, grounded
outlet. Locate the outlet behind the bath and within 24" (61 cm) of the blower motor.
Plug the blower motor into this outlet.
Clean the area of all dust and debris.
Kohler Co.
Blower Motor
9
1034591-2-F