Kohler K-1151 Panduan Instalasi - Halaman 10

Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Bak mandi Kohler K-1151. Kohler K-1151 48 halaman. Bath with airjets
Juga untuk Kohler K-1151: Panduan Pemilik Rumah (29 halaman), Panduan Pemilik Rumah (36 halaman), Panduan Pemilik Rumah (32 halaman), Panduan Pemilik Rumah (36 halaman), Panduan Instalasi (36 halaman), Manual Pengasahan Awal (Roughing-In) (4 halaman), Panduan Instalasi (48 halaman), Panduan Pemilik Rumah (29 halaman)

Kohler K-1151 Panduan Instalasi
Purge Mode
Increases Flow
On/Off
Decreases Flow

8. Test Run the Bath with Airjets

For information on unit operation, refer to the "Confirm Proper Operation" section.
Check all electrical connections, and make sure the electrical power to the bath with airjets is on.
Make sure all piping connections in the air harness are secure.
Verify that the blower motor is secure.
Temporarily remove the plastic drop cloth or other protective sheeting from the bath.
Fill the bath to a level at least 2" (5 cm) above the top of the highest airjet.
Check the drain piping for leaks. Repair any leaks.
Operate the bath and check for air flow through the airjets. Check the air piping for air leaks.
Stop the bath and drain the water.
Return the plastic drop cloth or other protective sheeting to the bath.
1040292-2-C
10
Kohler Co.