Kohler K-1151 Panduan Instalasi - Halaman 9

Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Bak mandi Kohler K-1151. Kohler K-1151 36 halaman. Bath with airjets
Juga untuk Kohler K-1151: Panduan Pemilik Rumah (29 halaman), Panduan Pemilik Rumah (36 halaman), Panduan Pemilik Rumah (32 halaman), Panduan Instalasi (48 halaman), Panduan Pemilik Rumah (36 halaman), Manual Pengasahan Awal (Roughing-In) (4 halaman), Panduan Instalasi (48 halaman), Panduan Pemilik Rumah (29 halaman)

Kohler K-1151 Panduan Instalasi

8. Test Run the Whirlpool

Check all electrical connections, and make sure the electrical power to the whirlpool and heater (if
equipped) is on.
Make sure all union connections to the pump and heater are securely hand tightened.
Verify that the pump banding straps have been cut (if applicable), and that the pump is resting
directly on the subfloor or whirlpool base.
Fill the whirlpool to a level at least 2" (5.1 cm) above the top of the highest jet.
Operate the whirlpool for 5 minutes, and check all whirlpool piping connections for leaks.
For additional information on whirlpool operation, refer to "Confirm Proper Operation".
Kohler Co.
9
1012295-2-D