Kohler 150EOZC Panduan Petunjuk Instalasi - Halaman 3

Jelajahi secara online atau unduh pdf Panduan Petunjuk Instalasi untuk Mesin Kohler 150EOZC. Kohler 150EOZC 12 halaman.

Figure 5 Panel Electrical Connections, Back View
2.2
Connect the 24-pin connector from the remote
extension harness to the 24-pin connector on the
remote full feature panel.
2.3
Mount the full feature panel using four screws (not
supplied).
2.4
Use rubber grommets and cable ties to protect
and secure the wiring harness. The installation
must conform to USCG Regulations Title 33CFR
Parts 183.425 through 183.460.
3.
Install the current transformers.
3.1
Remove the screws from the junction box panel
and remove the panel.
3.2
Mount the TB12 terminal block (266118) and the
marker strip (344553) in the junction box using two
screws (X-51-11) and two nuts (X-6210-4).
Note: Place all current transformers with the Dot
or HI mark toward the generator set output
leads.
3.3
For generator sets with 120/240-volt connections,
place the generator set output leads through the
current transformer one turn. For generator sets
with 480-volt connections, route the generator set
TT-1501
9/12
output leads through the current transformer two
turns.
3.4
Connect the white and black leads from the
current transformers to the terminal block (TB12)
as shown in Figure 6.
3.5
Make current transformer connections as shown
in Figure 6 through Figure 13.
Figure 6 Current Transformer Wiring to TB12
Terminal Block
A-344404-T
See Figure 11
or Figure 12
GM51639D-
3