Kohler 14/20RESAL Panduan Instalasi - Halaman 34
Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Generator Portabel Kohler 14/20RESAL. Kohler 14/20RESAL 44 halaman. Residential/commercial generator sets
1.11 Prestart Installation Check
Review the entire installation section. Inspect all wiring
and connections to verify that the generator set is ready
for operation. Check all items in the following Prestart
Checklist.
Prestart Checklist
Air Cleaner. Check that a clean air cleaner element is
installed to prevent unfiltered air from entering the
engine. See the generator set operation manual for
instructions.
Air Inlets. Check for clean and unobstructed air inlets.
Battery. Check for tight battery connections. Consult
the battery manufacturer's instructions regarding
battery care and maintenance.
Enclosure.
Check that all enclosure panels and
internal baffling are in place.
Exhaust System.
Check for exhaust leaks and
blockages. Check the muffler condition.
D
Inspect the exhaust system components for cracks,
leaks, and corrosion. Check for tight exhaust system
connections.
D
Check for corroded or broken metal parts and replace
them as needed.
D
Check that the exhaust outlet is unobstructed.
Oil Level. Maintain the oil level at or near, not over, the
full mark on the dipstick.
Operating Area. Check for obstructions that could
block the flow of cooling air. Keep the air intake area
clean. Do not leave rags, tools, or debris on or near the
generator set.
1.12 Set the Exerciser
Set the exerciser to automatically run the generator set
on the desired day and time every week or every two
weeks. See the generator set Operation Manual for
detailed descriptions of the unloaded and loaded
exercise operation.
1.12.1 RDC2 Controller
When power is applied to the RDC2 controller (when the
battery or the utility power for the battery charger is
34
Section 1 Installation
connected), you will be prompted to set the date and
time, and then to set the exerciser.
The first setting will flash. Press the Up and Down arrow
buttons to change the setting. Press Select to save the
setting and move on to the next. Repeat until the date,
time, and exercise are set and the controller display
shows the main menu. See the generator set Operation
Manual for more detailed instructions to set the date and
time and set the exerciser.
Press AUTO to place the generator set controller into
automatic mode.
Date:
05Dec2011
Time:
08:31am
Next Exercise:
08:31a 12Dec2011
Figure 1-37 Set Time, Date, and Exercise (RDC2)
1.12.2 DC2 Controller
To set the exerciser on the DC2 controller, first press
AUTO to place the controller into automatic (standby)
mode. Then press and hold the Exercise button. The
generator set will start and run a 20-minute unloaded
cycle exercise. The generator set will run automatically
for 20 minutes at the same time every 7 days. See the
generator set Operation Manual for more information.
1.12.3 Loaded Exercise
In order to set a loaded exercise using the RDC2 or DC2
controller, a Kohlerr Model RXT transfer switch must be
connected. See the generator set operation manual for
instructions to set a loaded exercise.
To set a loaded exercise on a generator set connected to
a transfer switch other than a Model RXT, use the
transfer switch controller to set the exercise. Refer to
the transfer switch operation manual for instructions.
Setting will flash.
Press the up and down arrow
buttons to change the setting.
Press Select to save the
setting.
tp6803
TP-6803 12/11