Kohler 23EKOZD Panduan Petunjuk Instalasi - Halaman 5

Jelajahi secara online atau unduh pdf Panduan Petunjuk Instalasi untuk Generator Portabel Kohler 23EKOZD. Kohler 23EKOZD 12 halaman.

Kohler 23EKOZD Panduan Petunjuk Instalasi
2.6
Ground lead connection. Connect the lead
(LK-0616-1715) to the ground stud located inside
the junction box using nut (M6923-06-80), washer
(M125A-06-80), lock washer (X-22-12 qty. 2), and
screw (M933-06020-60). Route the lead under the
U-channel shown in Figure 6. Connect the other
end of the lead to the customer connection panel
location. See Figure 9.
2.7
Fuel line connections. See Figure 9 for fuel
supply and return connection locations.
2.8
Secure the U-channel (X-6047-14) as shown in
Figure 6.
1
2
3
1. Customer connestion panel (GM93558 or GM95124)
2. Opening for exhaust tube.
3. Lead (LK-0616-1715).
4. Battery cable (X-545-259). Attach positive battery cable to
the starter motor.
5. Hose clamps (X-426-12 qty. 2). Attach seawater inlet hose to
inlet on the seawater pump.
6. Hose (X-373-30)
7. Battery cable (X-545-241 or X-545-176). Attach negative
battery cable to the engine block.
8. Insulated clamp (X-672-32)
9. Attach lead to the ground stud located inside of the junction
box using nut (M6923-06-80), washer (M125A-06-80),
lock washer (X-22-12 qty. 2), and screw (M933-06020-60).
Figure 9 Customer Connection Panel Connections
TT-1651 4/17a
4
5
6
7
9
8
GM93548-J
1. New location for existing hose connector
2. Route harness (GM96427) from temperature sensor to engine
harness.
Figure 10 New Location for Existing Hose Connector
1
2
GM93548-J
5