AQC MAXIREACH EBD-61505 Panduan Pemilik - Halaman 11
Jelajahi secara online atau unduh pdf Panduan Pemilik untuk Peralatan Industri AQC MAXIREACH EBD-61505. AQC MAXIREACH EBD-61505 16 halaman. Pivoting extension boom
Pivoting Extension Boom
10 . Insert tie rod end section of pull rod into boom base
pull rod support bracket and attach with fastener.
Replace last nut and washer onto threaded end of
pull rod.
Note: At this point, do not try to adjust and level the
horizontal support beam. Wait until optional equipment at
end of swing boom has been installed.
11 . Using the hose clamps supplied, fasten flexible hose
from spiral pipe section to boom base flexible hose
flange.
9.2.2
Assembly (middle pivot, if ordered)
1. Remove friction disks and fasteners from horizontal
steel tube middle pivot bracket.
2. Slide middle pivot assembly into pivot bracket.
3. Insert (1) friction disk (#10) over and under the pivot
section.
4. Using a spike, align holes of friction disks to pivot
assembly, ready for fasteners insertion.
5 . Insert bolt and washer from the top of assembly
and attach with nut and washer underneath pivot
assembly.
6. Using the hose clamps supplied, fasten flexible hose
from spiral pipe section to middle section.
9.3
Connection of boom base to exhaust
ductwork
MAXIREACH extension swing booms are supplied with
one (1) duct companion flange. By factory standards,
companion flange is installed on the upper (top) part of the
boom base. Field modification to have companion flange
installed at the bottom is as follows;
1. Remove duct companion flange from upper boom
base section
2. Remove boom base cover plate from lower boom
base section
3. Install duct companion flange on lower boom base
section
4. Install boom base cover plate on upper part of boom
base.
B
C
11