Aqua A-LEGIO SENSE Panduan Pengoperasian dan Pemeliharaan - Halaman 6
Jelajahi secara online atau unduh pdf Panduan Pengoperasian dan Pemeliharaan untuk Pompa Air Aqua A-LEGIO SENSE. Aqua A-LEGIO SENSE 12 halaman. Panel-mounted dosing system
A-POOL TOP EVO PH-CL
2. PROGRAMMING THE PANEL
After installing and connecting all the required probes and devices for the purchased panel, follow the
programming instructions set out in the pump and instrument manuals.
A list summarising the operations to follow for each panel is provided below.
2.1
HC151+ PUMP MENUS AND PROGRAMMING
Please refer to the HC151+ pump manual.
2.2
AE-START+ INSTRUMENT MENUS AND PROGRAMMING
Please refer to the AE-START+ instrument manual.
3. PROBE INSTALLATION AND MAINTENANCE
3.1
CL(J) 4-20 mA PROBE
1. Take the CL(J) probe out of the package and unscrew the membrane cap on the lower part of the
probe:
2. Lower the rubber ring on the membrane cap before filling it with the electrolyte gel provided in the
package:
ENGLISH
6/12