Aqua Creek Products F-802SC2 Manual - Halaman 8

Jelajahi secara online atau unduh pdf Manual untuk Sistem Pengangkatan Aqua Creek Products F-802SC2. Aqua Creek Products F-802SC2 16 halaman. Lift graph
Juga untuk Aqua Creek Products F-802SC2: Manual (2 halaman), Panduan Memulai Cepat (4 halaman)

Scout 2 Assembly Instructions (cont.)
3.
Install the CONTROL ARM ("A" END)
onto the mast as shown in FIGURE E.
Tighten the nylock nut (PHOTO 3, PAGE 7).
4.
Install the CHAIR ARM at the ends of the
LIFTING ARM and CONTROL ARM (FIGURE E).
Tighten the nylock nuts (PHOTOS 4 & 5).
NOTE: Make sure the letters match up; with the
chair facing away from the main assembly.
NOTE: Flip the CONTROL ARM (upper arm) out
of the way while the LIFTING ARM (lower arm) is
attached first (this makes it easier to line-up the
holes).
5.
Remove the fully charged BATTERY from the
charger and install the battery to the control
bracket, on top of the control box. Once secure,
connect the battery cable to the control box
cable. The lift will only operate when the battery is
connected properly.
WHEN LIFT IS NOT IN SERVICE, STORE BATTERY
ON THE CHARGER!
8
Copyright © 2017 Aqua Creek Products All Rights Reserved
1/2" X 2-3/4" SHOULDER BOLT
A
B
FIGURE E
3/8"-16 NYLOCK NUT (2)
3/8" FLAT WASHER (2)
FIGURE F
PHOTO 4
3/8" FLAT WASHER
3/8"-16 NYLOCK NUT
"A" END
SCOUT CONTROL ARM
1/2" X 3" SHOULDER BOLT (2)
CHAIR-ARM ASSEMBLY
PHOTO 5
Revised 5/9/17