Aqua Creek Products F-RNGR2-05 Manual - Halaman 9
Jelajahi secara online atau unduh pdf Manual untuk Peralatan Pencahayaan Aqua Creek Products F-RNGR2-05. Aqua Creek Products F-RNGR2-05 20 halaman. Pool lift
1. Attach seat belt to the seat.
2. Install the Ranger 2 pool lift onto the four (4) anchors using
the supplied 1/2 inch x 1 1/2 inches stainless steel hex head
bolts and 1/2 inch stainless steel washers. Make sure all bolts
are tight before using the lift.
3. Apply dielectric grease to the plug terminals, including
the o-ring seal. Plug the handset cable into the large handset
socket on the bottom of the control box. Press the cord end
fi rmly into the socket until you are sure it is completely in the
socket. Failure to fully push the remote cord into the socket may result in faulty or interrupted
operation.
4. Before installing the battery, place it on the charging unit and let it charge for 24 hours. Make
sure the orange "charge" light illuminates when the battery is being charged. When the orange
charge light shuts off , the battery is fully charged.
5. Remove the fully charged battery
from the charger and install it on top
of the control box. The battery will line
up with the control box, and will 'click'
when it properly locks in place.
6. With the lift completely assembled,
run the lift fully out and back in 3-5
times, without weight, for the lifts
"break in" cycle period.
WHEN NOT IN USE, STORE THE
BATTERY ON THE CHARGER!
Copyright © 2021 Aqua Creek Products All Rights Reserved
Ranger 2 Assembly Instructions
SEE FIGURE D
RANGER 2 POOL LIFT
ATTACH FULLY
CHARGED BATTERY
CONTROL BOX
1/2" TOOTH
WASHER (1)
ANCHORS (4)
INSTALLED
FLUSH W/ DECK
LOOP ON TOP
FOR EASY ACCESS
THREAD THROUGH
SLOTS AND PINCH
FIGURE D
TOGETHER TO HOLD
HANDSET
PLUGS INTO
CONTROL BOX
Revised 5/28/21
1/2" X 1 1/2"
HEX BOLT (4)
1/2" FLAT
WASHER (3)
POOL
WALL
9