Aqua Lung CORE Panduan Servis - Halaman 15
Jelajahi secara online atau unduh pdf Panduan Servis untuk Pengontrol Aqua Lung CORE. Aqua Lung CORE 18 halaman.
- 1. Table of Contents
- 2. Copyright
- 3. Introduction
- 4. Warnings, Attention, Notes
- 5. Maintenance
- 6. General Instructions
- 7. General Conventions
- 8. Disassembly Procedure
- 9. Reassembly Procedure
- 10. Controle Final
- 11. Final Reassembly
- 12. Appendix
- 13. Procedure a - Cleaning and Lubricating
- 14. Maintenance Notes
N° REFERENCE
127818
129914
124567
TEST
INSTRUCTIONS
Leak Test
160 bar < Working pressure < 200 bar
Medium Pressure
160 bar < Working pressure < 200 bar
Opening effort
160 bar < Working pressure < 200 bar
Effort / Flow
MP at 9.5 bar ± 0.5 bar : Core
MP at 8.5 bar ± 0.5 bar : Core supreme
and Octopus
nd
Service Manual Core 2
Rev. 05/2015
Table 4. Torque values
DESCRIPTION
Insert screw
Heat exchanger
nd
Hose, 2
Table 5. Checking specifications
stage
stage side
SPECIFICATIONS
No leak
MP at 9.5 bar ± 0.5 bar : Core
MP at 8.5 bar ± 0.5 bar : Core supreme
Between 2.5 mbar and 3.5 mbar : Core
Between 3.3 mbar and 4.3 mbar : Core supreme and
Octopus
15 mbar maxi at 400 L/min
Service Manual Core 2
COUPLE
0.3 m.kg (2.17 ft.lb)
0,5 m.kg (3.7 ft.lb)
0,3 m.Kg (2.17 ft.lb) when tight against
the plastic screw
0,5 m.Kg (3.7 ft.lb) when tight against the
metal heat exhanger
nd
stage
15